The document linked below contains all of the trip reports from the trash sink dig project. This was ultimately unsuccessful which led to the blasting project that opened the back door to Carroll Cave.
The document also contains meeting minutes from CCC meetings 1995 through December 2000.
all Trash sink dig rep & CCC Meeting Minutes Nov 1995 – Dec 2000