7/3/2018 – data collection

Trip date:  7/3/2018 Project manager:  Jack Peters Trip purpose:  Initially for education.  Download data loggers Areas of Cave visited:  CarrollPassage, Upstream Thunder Trip participants:  Bill Gee, Jack Peters, Jaxson Peters, Kristen Godfrey Entry Time:  10:20 Exit...

Flood events in Lower Thunder River

In early January 2018 Carroll Cave Conservancy bought and installed another stream level data logger.  The new logger is located about 150 feet downstream from Thunder Falls. The hypothesis supporting the new logger is that Lower Thunder River floods before Upper...

2017 Stream Flow Project Report

2017 was, with one exception, a rather dull year regarding hydrology events in Carroll Cave.  Two major floods were recorded along with one minor flood. The major floods occurred on 29 April and 5 May.  In both cases Thunder River rose to a bit over 20 feet.  This is...

1/7/2018 – Carroll Passage visit

Your Name:  Bruce Archambault Trip date:  7th January 2018 Project manager:  Bill Gee (presumably) Trip purpose:  Data Collection Areas of Cave visited:  CarrollPassage Trip participants:  See Bill Gee’s report Entry Time:  0900 Exit Time:  See Bill Gee’s...