Report by Rick Hines
I originally scheduled two work weekends in November at the Pic Walenta Memorial Shelter house at the Carroll Cave campground. With a large crew and good weather, we accomplished a lot on the first weekend, November 15 – 17. I hoped we could finish up in one more day and change the second work weekend to a day trip on November 23rd. We made good progress on the 23rd but with a much smaller crew, there’s still a little work left for next spring.
Before the work weekends, I purchased concrete block and made two trips pulling a trailer load to deliver the blocks, a cement mixer, and other tools to the site.
Thanks to the following for their help:
Nov 15 – 17 Nov 23
Rick Hines Rick Hines
Marty Griffin Bill Gee
Jeff Bowman John McGuire
Jamie Bowman Jerel Waters
Kevin Feltz Preston Hunter
Peter Schnegelberger
Nathon, Sam, & Ben Taylor
Mike Kovacs
Martin Carmichael
Jack Rufener
Amy Fawks
Gabriel Fedynich
Tasks accomplished on first weekend:
1. Masonry wall around firebox complete
2. Electrical in the container is complete.
3. Board and batten outside siding complete.
4. Fire ring windbreak taken down.
5. 60% of white inside paneling up.
6. Shelves built.
7. Part of the grass cut.
8. Encouraging progress on mower
Tasks accomplished Nov 23:
1. 95% of the white paneling on the inside walls
2. 40% of screw heads and panel joints cocked.
3. 40% of cove trim on paneling exposed edges and corners complete.
4. White paint trim.
5. All outlet covers installed.
Tasks remaining for next spring:
1. Resolve lawn mower issue.
2. Install the last piece of white paneling.
3. Complete install of trim boards
4. White paint as needed
5. Install electrical box on motion sensor light on south.
6. Silicone cock around clearstory windows.
7. Build useful stuff with excess white paneling and 2x6s’
8. Cut up and stack all the excess wood for firewood.
9. Remove and salvage all the excess steel on sight.
10. Cement around base of silo to try to keep the mice out.
11. Fabricate a strip of steel to block the top 6” of the firebox opening to eliminate smoke escaping. We tested this issue by holding a board over the top of the opening.
12. Cut the bottom edge of the white paneling to raise the edge one inch from the concrete floor and seal the bottom edge with paint.
Additionally, we can consider adding walls/doors to close in the last three openings.
Thanks to all the hardworking and talented volunteers who helped this November and on prior work details!
Photos of the work follow. Thanks to Nathon and Mike for adding to photos.
Rick Hines
- Jack Rufener works on electrics in the storage container while Craig Hines looks on.
- Rick Hines and Doug Feakes finishing the masonry wall around the fire box.
- Laying the masonry wall around teh firebox. Keven Feltz in the baseball cap, others not identified.
- The masonry wall around the firebox is mostly complete.
- Working on the masonry wall around the firebox.
- Cutting stones for the masonry wall.
- Measure twice, cut once! Getting ready to place the windows.
- Laying the masonry wall around the firebox.
- Left to right – John McGuire, Preston Hunter, Bill Gee, Jerel Waters, Rick Hines. Photo by Rick Hines.
- Left to right – John McGuire, Bill Gee, Preson Hunter, Jerel Waters. Photo by Rick HInes.
- Bill Gee installing a piece of plywood. In the background Preston Hunter is caulking seams and screwholes. Photo by Rick Hines.
- John McGuire getting ready to hang a piece of plywood. Photo by Rick Hines.
- Jerel Waters painting corner trim. Photo by Rick Hines.